DEDDIE announced the launch of the process of receiving applications from interested parties for the installation of rooftop photovoltaic power stations with the system of self-production and net metering. This requires the drafting of the draft contracts, the second meter costs, the overall installation guide and a thorough updates provided to DEDDIE regional offices on the procedures followed.